Had 4 people turn up for the working day on the 23rd July. Jobs completed included track joints re-aligned on Simpson’s Peak. A new passing loop installed at Skinners Creek. The track all cleaned and most of it hoovered. Point numbers and magnet locations cheeked and any missing indicators replaced. he last job was some tree stump casting. 
This work was all nearly complete before lunch, with just a few bits needing finishing after lunch. of the after lunch session was spent testing two FremOn30 modules that were brought along.
Work was also started on the low bridge after Bouviers Peak, but more strengthening work is needed to the ply boards for this to work better. Not sure if it will be a swing bridge or a lift bridge. Need to look into this.
As we were all busy working I forget to take many pictures, so only a few to add.