On Saturday 30th September, the members of the Surrey & Sussex Black Sheep set up their largest modular layout to date, some 66′ or 20m around four sides of a room at the annual Seaboard Southern exhibition.
Seaboard Southern Annual Exhibition 2016
Saturday saw six module owners and three additional engine drivers arrive at the annual Seaboard Southern exhibition to which we’d been invited. By the skin of our teeth, due to some gremlins, we had erected and tested more than 60′ of modules, our longest layout to date.
Operating was on a warrant basis, with two in operation, one each way between the fiddle yards and the central passing module. There were also sidings to shunt in each direction, adding to the operational interest. With a crew of eight, we were split into teams of four and operated an hour on with an hour’s rest. That made the day go very quickly.
Striking down was a lot quicker, with everything boxed up and ready to load within 45 minutes of closing time. Lots of things were learned, experiences gained, which means that the next outing will be even better than this.
Modular narrow gauge railway modelling is some much more fun than having a single layout, not least because it doesn’t have to be the same each time. It’s also great to be able to exhibit works in progress, so long as they are making progress.
We’re waiting for confirmation of the date for this event next year, when we’ll hopefully be doing it all again, bigger and better.
Autumn Modelling Day 2015
At the 7mm NGA‘s Surrey Area Group Autumn Modelling Day, I took my four module boards to set up in the hall with Brian’s, partly to show other people the concept but also to try out other operating methods. Continue reading Autumn Modelling Day 2015
Seaboard Southern Annual Exhibition 2015

Well, that event‘s been and gone. Thankfully, it appears to have been a huge success. Here’s what was learned on the day:
- It is possible to set up 23′ of modular model railway that’s never been together before in under two hours, including consumption of bacon butty and coffee
- A line token, or warrant, makes control easier for those operators that don’t get the whole single track main line concept
- A Work In Progress is well received in an exhibition environment, if it’s quite apparent what the end result is supposed to be
- It is actually possible to have too many trains, at least for the immediate occasion. One per fiddle yard road plus a spare would have sufficed
- We’re not the only nutters who are inspired, interested or intrigued by this project. At least three people loosely attached to the group have committed and we took enquiries from visitors too
Feedback from the show organisers has been positive too, which might result in a repeat invitation for next year. That’ll mean more modules and more progress on existing modules will be required!
Fremon30 boards 3 and 4
Fremon30 boards update
This afternoon I worked on the first two boards for the modular layout.
This is is the first board with the gapmasters been glued in place.
what cannot be clearly seen is that all the tracks and clearances are marked on the board.
The centre track in place.
The second track in place. This hasn’t got gap masters at the ends. I will use normal copper clad sleepers.
The third track fitted, that’s one side down. Ply fascia still to add to this board and the next one.
The fourth track is added. The gap between tracks is the maximum loading gauge and is set using a standard on30 loading gauge.
Thats the the fifth and final track added. I have pre drilled holes for each rail 75mm in from each end. This will allow each rail to be connected twice to the DCC bus line fitted to the underneath
.
To make the rails straight I used a long spirit level.
The second board was then added and the markings carried across. Gapmasters were added to the centre line track.
The he first point was then added and tracks linked up. The centre track is not fitted, just laid into rough position. I will need to order the three way point and may need to build a short extension board for this all to fit.
A good afternoons work. Hopefully I have enough turnouts and track to do the other 2 modules. I will check this one evening this week.
FremOn30 modular boards
More work done on the FremOn30 modular layout boards.
1 board is complete with side fascia’s
1 board is complete waiting side fascia’s
2 boards end trim to cut and fascia’s to add
One set of end boards is made and one pair of boards are now boxed.

All boards have copper tape added for the DCC bus for track and another DCC bus for accessory’s
Brian Daly
Brian is already well-known for his 0n30 layouts, having exhibited several at many different shows in this country and across Europe.
Brian is one of the driving forces behind the current wave of Frem0n30, at least in Surrey and adjacent counties.
He is currently President of the Rio Florida Logging Company, and our expert of DCC.
You can see some of Brian’s posts from his blog here.














